New 3G Pitch at Millom leisure centre

Premium Tiger Turf Championship 50 was installed to FIFA Quality accreditation (Image: STM)

Synthetic Turf Management recently completed a comprehensive transformation from a traditional sand-filled hockey pitch to a state-of-the-art 3G football and multi-sports facility at the leisure centre in Millom, Cumbria.

Project scope & innovation included:

• Integral part of an £11M design and build project by Maryport-based Thomas Armstrong Group

• Complete resurfacing including removal of existing sand-filled hockey artificial turf & 15mm Insitu performance pad

• Project duration 3 weeks

• Premium TigerTurf UK Ltd Championship 50 installation to FIFA Quality accreditation

• Enhanced safety features with new perimeter kickboards

• Part replacement of 3m high twin bar fencing 

• Improved accessibility through strategic multi-point gate system

The project delivered exceptional sports surfaces that serve both educational and community needs, creating lasting value and and landmark sports facility.

Recommended Posts